• Mon. Feb 6th, 2023

traffic

  • Home
  • Collins Avenue at Riverside Drive in the East End closed until October

Collins Avenue at Riverside Drive in the East End closed until October

Repairs to the railroad bridge over Collins Avenue in the East End resume this Monday, Sept. 19.

I-71 South closed at MLK exit ‘for the foreseeable future’ after crash

I-71 South is shut down at the Martin Luther King exit "for the foreseeable future" following a crash Monday night,…

Traffic Switch on Galbraith Road Bridge for Ongoing Deck Replacement Project

Through traffic traveling over the Galbraith Road bridge between Hartwell and Arlington Heights will be switched to the north side…